top of page

1970's Bathroom Revamp!

This bathroom is now unrecognisable from its former state! The bath used to be located on the right hand wall, toilet located where the shower tray is and basin was fitted to the left hand wall so the layout has been totally reconfigured! The window was also changed for a slimmer window and located slightly higher to make space for the basin. I built shelves to the left side of the bathroom to accommodate towels & bed linen etc. I love the feeling of space in this bathroom due to the generous size shower tray. The tiles are a great choice all though very brave choice in my opinion! This a great functional shower room finished to the highest possible standard. Project duration 17 days.






Comments


Featured Posts
Recent Posts
Archive
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page